高溫剛體行車滑觸線安裝工序
更新時間:2013-11-22  瀏覽次數(shù):

      高溫剛體行車滑觸線應用范圍較廣,載流量大,強度高,可是適用于比較惡劣的環(huán)境中,比如煉鋼廠、碼頭、冶金、化工車間。今天小編給大家講講解下高溫剛體行車滑觸線的安裝工序:

1.安裝角鋼支架 (Installation of angle steel bracket )

      用螺栓或焊接方式按規(guī)定間距把角鋼支架固定在行車道軌軌梁上。必須保證支架在整個線上的平直,角鋼的伸出尺寸一致,角鋼要平行不能歪斜。(Fix angle steel brackets on track rail tie-plate as per specified spacing by using bolt or welding method. It is essential to ensure that brackets are straight on the whole line, extruding dimensions of angle steel are identical and angle steels should be paralleled with each other rather than inclined.)

2. 安裝滑觸線及接頭 (Installation of sliding-contact wire and connector )

      把吊掛夾套在滑觸線上,吊掛夾卡住滑觸線卡口,將吊掛夾安裝在角鋼支架上,螺母不要擰緊。四根滑觸線裝好后調平,旋緊吊掛夾的螺母。把接頭裝入第一組滑觸線的另一端,同樣方法安裝第二組滑觸線。用接頭將兩根滑觸線聯(lián)接好,裝上接頭護套,將滑觸線調平、固緊。依次裝好全部滑觸線。注意接頭處應平滑,間隙<0.5mm (Fix suspension clip on sliding-contact wire, and fix suspension clip in bayonet of sliding-contact wire, install suspension clip in angle steel bracket but do not tighten nut. After installation and leveling of four pieces of sliding-contact wire, screw nut of suspension tightly. Fix connector into the other end of the first group of sliding-contact wires, and install the second group of sliding-contact wires in accordance with the same method. Connect two pieces of sliding-contact wire by connector, install connector sheath, level and fasten sliding-contact wire. Install all sliding-contact wires in proper order. Make sure to keep smoothness at joints and spacing<0.5mm. )

3.安裝動力輸入段 (Installation of power input section )

      按預先設計好的輸電方式和設計位置安裝動力輸入段,螺栓一定要旋緊,再裝上護罩。(Install power input section as per the power transmission method and design position that have been designed in advance, and make sure to screw it tightly before installation of protection cover.

4.裝護套固定夾 (Installation of sheath )

      按照設計方案安裝固定夾,一條線二個。 (Install retaining clip as per design, two clips for each wire. )

5.膨脹段和檢修段的安裝 (Installation of expansion section and inspection/maintenance section )

      方法同接頭的安裝,安裝位置應按設計方案定。 (The method is identical with installation of connector, and installation positions are to be determined as per design.)

6.裝端套 (Installation of pothead)

       在滑觸線的兩頭安裝端套,也可在吊掛前先裝上。 (Install potheads on both ends of sliding-contact wire, it is also allowed to install before suspension. )

7.檢查 (Inspection)

       整條滑觸線安裝好后應認真檢查,滑觸線是否平直,間距是否一致,吊掛架是否旋緊。接頭處是否平滑。 (After completion of installation of the whole sliding-contact wire, it is necessary to inspect carefully whether sliding-contact wire is straight, whether spaces are identical, whether suspension is screwed tightly, and whether joints are smooth. )

8.安裝集電器及其支架 (Installation of current collector and its bracket )

      滑觸線安裝好后,即可安裝集電器,按照高度尺寸H(支架中心到滑靴上平面的高度尺寸)和觸靴端中心略高些的要求,把支架焊接在移動的設備上,再將集電器依次安裝到集電器支架上旋緊固定。檢查觸靴是否轉動靈活,與導線的接觸是否良好,否則應進行調整。( After installation of sliding-contact wire, proceed with installation of current collector, in accordance with height dimension H (height from bracket center to upper surface of contact slipper) and requirement that the center of contact slipper side should be slightly higher, weld bracket on mobile equipment, then install current collectors in proper order on collector bracket and screw tightly. Inspect whether contact slipper turns flexibly, whether the contact with conductive wire is good, otherwise it is necessary to adjust. )

9.集電器接線 (Wire connection of current collector )

      將集電器的電纜與用電設備電源電纜接好。注意在接線前,應按常規(guī)檢查設備及相關電器電機的各項絕緣要求是否符合要求,若出現(xiàn)異常應檢修或更換。(Connect cable of collector with power supply cable of power consumption equipment. Before wire connection, make sure to inspect whether insulation requirements of equipments, electric appliance and electric motor are met, in case of abnormity, it is necessary to inspect, repair or replace.)

10.接電源 (Connection of power supply)

       把電源線牢固的接在動力輸入段上,注意壓緊。不得有松動現(xiàn)象。 (Connect power supply line firmly on power input section, and make sure to press tightly. There should be no loose phenomenon. )

11.試車 (Trial run)

       先應空載試車,往復運行幾個來回,若無異常即可投入負荷試車,觀察電壓、電流是否正常,若有異常應立即停車,切斷電源,進行檢查,故障排除后再投入運行。(Firstly, it is necessary to conduct trial run for several times of reciprocating operation under no load, proceed with under-load trial run if there is no abnormity, observe whether voltage and current are normal, shut down immediately in case of abnormity, disconnect power supply and inspect, and proceed with operation again after elimination of malfunctions.)